Education: Dulwich Prep Swimming Pool
Client:
Dulwich Prep, London
Project Value:
Confidential
Timescale:
6 weeks
Client Brief:
An extensive project, requiring intricate knowledge and the ability to work to strict time scales, it consisted of the full overhaul and restoration of the main indoor swimming pool:
- The entire pool was refurbished including drainage, air ventilation units and hygienic white Altro cladding
- It was fully decorated throughout using a combination of specialised Eproxy paints and Aquaguard paints
- The walkways and columns were tiled with coping stones being fitted to pool perimeters
- A range of new diving boards were installed