Education: Dulwich Prep Swimming Pool

  • Client:

    Dulwich Prep, London

  • Project Value:

    Confidential

  • Timescale:

    6 weeks

  • Client Brief:

An extensive project, requiring intricate knowledge and the ability to work to strict time scales, it consisted of the full overhaul and restoration of the main indoor swimming pool:

  • The entire pool was refurbished including drainage, air ventilation units and hygienic white Altro cladding
  • It was fully decorated throughout using a combination of specialised Eproxy paints and Aquaguard paints
  • The walkways and columns were tiled with coping stones being fitted to pool perimeters
  • A range of new diving boards were installed
Scroll to Top