EDUCATION
Having completed numerous projects for education faculties including Dulwich Prep, London and the Old Palace of John Whitgift, London, we are in the enviable position of understanding the strict deadlines and project turnaround times for assignments undertaken at educational establishments. We ensure all projects are completed on budget and within the agreed timeframe to the high standard that is synonymous with our brand whilst maintaining a professional and safe working environment at all times (when necessary, all of our team are fully DBS, previously CRB, checked); this has resulted in successfully securing repeat business over many years.
With the increasing need for schools to expand their facilities, we are able to work in partnership with our sister company mypods, who design and build bespoke cedar-clad modular units that can be utilised for a variety of requirements including classrooms, meeting rooms, offices and halls.
Swimming Pool: Dulwich Prep, London
Client:
Dulwich Prep, London
Project Value:
Confidential
Timescale:
6 weeks
Client Brief:
An extensive project, requiring intricate knowledge and the ability to work to strict time scales, it consisted of the full overhaul and restoration of the main indoor swimming pool. The entire pool was refurbished including drainage, air ventilation units, cladding and was fully decorated throughout. The walkways and columns were tiled with coping stones and diving platforms were installed.
School Facilities: Dulwich Prep, London
Client:
Dulwich Prep, London
Project Value:
Confidential
Timescale:
6 weeks
Client Brief:
This considerable project comprised of the remodelling and refurbishment of many classrooms, toilets and showering facilities as well as installing a completely new heating and electrical system. A complete overhaul of the school’s car park was required, with major groundworks and drainage was undertaken. Also, a contemporary bike storage pod was constructed, hardstandings including specialist resin-bond walkways together with a new outdoor area for the children to enjoy all year round. All works were delivered on time and on budget.
Staff Facilities: Dulwich Prep, London
Client:
Dulwich Prep, London
Project Value:
Confidential
Timescale:
8 weeks
Client Brief:
The brief required two redundant classrooms to be remodelled into functional and spacious staff changing rooms. The areas were to include showering and toilet facilities, as well as an area to be fully accessible and operational for wheelchair access. Also, a major refurbishment was in order to provide the school with a much-needed overhaul of the changing rooms, WC’s and shower areas throughout. The work created a much-needed improvement and will allow the pupils many years of use, in the knowledge that with the electronic access panels that were installed it will provide a safe and secure area.
School Renovation: Old Palace of John Whitgift, London
Client:
Old Palace of John Whitgift, South London
Project Value:
Confidential
Timescale:
8 weeks
Client Brief:
Complete renovation of two separate wings of the school. The main school benefitted from new windows and doors throughout the entire area, whilst internally the reforming, reconstruction and refurbishment of many of the classrooms was undertaken within just eight weeks. During these works the main science block was also undergoing a complete makeover with newly formed classrooms, study rooms, storage areas, toilets and showers and specialist equipment was being installed. All areas affected benefited from a complete new heating and wiring system.