Education: Dulwich Prep Swimming Pool

  • Client:

    Dulwich Prep, London

  • Project Value:

    Confidential

  • Timescale:

    6 weeks

  • Client Brief:

An extensive project, requiring intricate knowledge and the ability to work to strict time scales, it consisted of the full overhaul and restoration of the main indoor swimming pool. The entire pool was refurbished including drainage, air ventilation units, and cladding and was fully decorated throughout. The walkways and columns were tiled with coping stones, and diving platforms were installed.

Scroll to Top